London Gatwick brand flow line over dark blue background London Gatwick brand flow line over dark blue background

Northern Runway Reports

PEIR 2021 Volume 2

CHAPTER 8

Figure 8.4.1 - Existing and Proposed Zones of Theoretical Visibility (ZTV) Within 5 km Radius Study Area

Figure 8.4.2 - National Landscape Character Areas and Landscape Designations

Figure 8.4.3 - Existing Zone of Theoretical Visibility and Viewpoint Locations

Figure 8.4.4 - Viewpoint 1: Airport Way / Public Right of Way 346/2Sy (Sussex Border Path)

Figure 8.4.5 - Viewpoint 2: Orange Short Stay Multi Storey Car Park

Figure 8.4.6 - Viewpoint 3: Car Rental South Terminal Public Right of Way 360/Sy

Figure 8.4.7 - Viewpoint 4: River Mole Public Right of Way 346 (Sussex Border Path)

Figure 8.4.8 - Viewpoint 5: River Mole Public Right of Way 346 (Sussex Border Path)

Figure 8.4.9 - Viewpoint 6: Riverside Garden Park National Cycle Route 21

Figure 8.4.10 - Viewpoint 7: Horley Riverside

Figure 8.4.11 - Viewpoint 8: Public Right of Way 362a North of A23 & South Terminal

Figure 8.4.12 - Viewpoint 9: Balcombe Road at Pentagon Field

Figure 8.4.13 - Viewpoint 10: Public Right of Way 359/Sy at Pentagon Field

Figure 8.4.14 - Viewpoint 11: Public Right of Way 360/1SY at Tinsley Green

Figure 8.4.15 - Viewpoint 12: Bridleway 352/Sy at Rowley Farm

Figure 8.4.16 - Viewpoint 13: Ifield Road

Figure 8.4.17 - Viewpoint 14: Public Right of Way 344 (Sussex Border Path) East of Charlwood

Figure 8.4.18 - Viewpoint 15: Norwood Hill

Figure 8.4.19 - Viewpoint 16: Turners Hill

Figure 8.4.20 - Viewpoint 17: Tilgate Park

Figure 8.4.21 - Aerial Photography and Visual Receptor Locations

Figure 8.6.1 - Topography

Figure 8.6.2 - District Landscape and Townscape Character Areas Within 5 km Radius

Figure 8.6.3 - 2018 Baseline Gatwick Overflights

Figure 8.6.4 - All 2018 Baseline Overflights Within 35 mile Radius

Figure 8.6.5 - Increase in Gatwick Overflights

Figure 8.6.6 - Increase in Gatwick Overflights Compared with All Overflights

Figure 8.9.1 - Existing and Proposed Wireline - Winter Viewpoint 1

Figure 8.9.2 - Single Frame Wireline - Winter Viewpoint 1

Figure 8.9.3 - Existing and Proposed Wireline - Summer Viewpoint 1

Figure 8.9.4 - Single Frame Wireline - Summer Viewpoint 1

Figure 8.9.5 - Existing and Proposed Wireline - Winter Viewpoint 2

Figure 8.9.6 - Single Frame Wireline - Winter Viewpoint 2

Figure 8.9.7 - Existing and Proposed Wireline - Summer Viewpoint 2

Figure 8.9.8 - Single Frame Wireline - Summer Viewpoint 2

Figure 8.9.9 - Existing and Proposed Wireline - Winter Viewpoint 4

Figure 8.9.10 - Single Frame Wireline - Winter Viewpoint 4

Figure 8.9.11 - Existing and Proposed Wireline - Summer Viewpoint 4

Figure 8.9.12 - Single Frame Wireline - Summer Viewpoint 4

Figure 8.9.13 - Existing and Proposed Wireline - Winter Viewpoint 5

Figure 8.9.14 - Single Frame Wireline - Winter Viewpoint 5

Figure 8.9.15 - Existing and Proposed Wireline - Summer Viewpoint 5

Figure 8.9.16 - Single Frame Wireline - Summer Viewpoint 5

Figure 8.9.17 - Existing and Proposed Wireline - Winter Viewpoint 6

Figure 8.9.18 - Single Frame Wireline - Winter Viewpoint 6

Figure 8.9.19 - Existing and Proposed Wireline - Summer Viewpoint 6

Figure 8.9.20 - Single Frame Wireline - Summer Viewpoint 6

Figure 8.9.21 - Existing and Proposed Wireline - Winter Viewpoint 8

Figure 8.9.22 - Single Frame Wireline - Winter Viewpoint 8

Figure 8.9.23 - Existing and Proposed Wireline - Summer Viewpoint 8

Figure 8.9.24 - Single Frame Wireline - Summer Viewpoint 8

Figure 8.9.25 - Existing and Proposed Wireline - Winter Viewpoint 9

Figure 8.9.26 - Single Frame Wireline - Winter Viewpoint 9

Figure 8.9.27 - Existing and Proposed Wireline - Summer Viewpoint 9

Figure 8.9.28 - Single Frame Wireline - Summer Viewpoint 9

Figure 8.9.29 - Existing and Proposed Wireline - Winter Viewpoint 10

Figure 8.9.30 - Single Frame Wireline - Winter Viewpoint 10

Figure 8.9.31 - Existing and Proposed Wireline - Summer Viewpoint 10

Figure 8.9.32 - Single Frame Wireline - Summer Viewpoint 10

Figure 8.9.33 - Existing and Proposed Wireline - Summer Viewpoint 13

Figure 8.9.34 - Single Frame Wireline - Summer Viewpoint 13

Figure 8.9.35 - Existing and Proposed Wireline - Winter Viewpoint 15

Figure 8.9.36 - Single Frame Wireline - Winter Viewpoint 15

CHAPTER 14

Figure 14.4.1 - Baseline Noise Monitoring Sites

Figure 14.6.1 - 2019 Baseline Leq 16 hr

Figure 14.6.2 - 2019 Air Noise Baseline Leq 8 hr Night

Figure 14.6.3 - 2019 Air Noise Baseline N65 Day

Figure 14.6.4 - 2019 Air Noise Baseline N60 Night

Figure 14.6.5 - 2019 Air Noise Baseline Lden Annual Average 24 Hour

Figure 14.6.6 - 2019 Air Noise Baseline LNight Annual Average Night

Figure 14.6.7 - 2018 Baseline Gatwick Overflights

Figure 14.6.8 - 2018 Baseline Non-Gatwick Overflights

Figure 14.6.9 - 2018 Baseline All Airport Overflights

Figure 14.6.10 - 2018 Baseline Road Traffic Noise Levels

Figure 14.6.11 - 2032 Air Noise Baseline Leq 16 hr

Figure 14.6.12 - 2032 Air Noise Baseline Leq 8 hr Night

Figure 14.6.13 - 2032 Air Noise Baseline N65 Day

Figure 14.6.14 - 2032 Air Noise Baseline N60 Night

Figure 14.6.15 - 2032 Air Noise Baseline Lden Annual Average 24 Hour

Figure 14.6.16 - 2032 Air Noise Baseline LNight Annual Average Night

Figure 14.6.17 - 2032 Road Traffic Business as Usual Noise Levels

Figure 14.6.18 - 2038 Air Noise Baseline Leq 16 hr

Figure 14.6.19 - 2038 Air Noise Baseline Leq 8 hr Night

Figure 14.6.20 - 2038 Air Noise Baseline N65 Day

Figure 14.6.21 - 2038 Air Noise Baseline N60 Night

Figure 14.6.22 - 2038 Air Noise Baseline Lden Annual Average 24 Hour

Figure 14.6.23 - 2038 Air Noise Baseline LNight Annual Average Night

Figure 14.8.1 - Proposed Noise Insulation Scheme Zones

Figure 14.9.1 - 2032 Air Noise with Project Leq 16 hr and Community Representative Locations

Figure 14.9.2 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference Leq 16 hr

Figure 14.9.3 - 2032 Air Noise with Project Slower Transition Case v 2032 Baseline Difference Leq 16 hr

Figure 14.9.4 - 2032 Air Noise with Project v 2019 Baseline Difference Leq 16 hr

Figure 14.9.5 - 2032 Air Noise with Project Slower Transition Case v 2019 Baseline Difference Leq 16 hr

Figure 14.9.6 - 2013 Air Noise Baseline Leq 16 hr

Figure 14.9.7 - 2032 Air Noise with Project Leq 8 hr Night

Figure 14.9.8 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference Leq 8 hr Night

Figure 14.9.9 - 2032 Air Noise with Project Slower Transition Case v 2032 Baseline Difference Leq 8 hr Night

Figure 14.9.10 - 2032 Air Noise with Project Central Case v 2019 Baseline Difference Leq 8 hr Night

Figure 14.9.11 - 2032 Air Noise with Project Slower Transition Case v 2019 Baseline Difference Leq 8 hr Night

Figure 14.9.12 - 2013 Air Noise Baseline Leq 8 hr Night

Figure 14.9.13 - 2032 Air Noise with Project N65 Day

Figure 14.9.14 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference N65 Day

Figure 14.9.15 - 2032 Air Noise with Project Slower Transition Case v 2032 Baseline Difference N65 Day

Figure 14.9.16 - 2032 Air Noise with Project Central Case v 2019 Baseline Difference N65 Day

Figure 14.9.17 - 2032 Air Noise with Project Slower Transition Case v 2019 Baseline Diference

Figure 14.9.18 - 2032 Air Noise with Project N60 Night

Figure 14.9.19 - 2032 Air Noise with Project Central Case v 2032 Baseline Difference

Figure 14.9.20 - 2032 Air Noise with Project Slower Transition Case v 2032 Baseline Difference N60 Night

Figure 14.9.21 - 2032 Air Noise with Project Central Case v 2019 Baseline Difference N60 Night

Figure 14.9.22 - 2032 Air Noise with Project Slower Transition Case v 2019 Baseline Difference N60 Night

Figure 14.9.23 - 2032 Air Noise Baseline and Northern Runway A320 Lmax 60 and 65dB Footprints

Figure 14.9.24 - 2032 Air Noise Baseline and Northern Runway A320 Neo Lmax 60 and 65dB Footprints

Figure 14.9.25 - A320 Departure Lmax Examples: Northern Runway versus Baseline Difference

Figure 14.9.26 - 2032 Air Noise Lden Annual Contours with the Project

Figure 14.9.27 - 2032 Air Noise LNight Annual Contours with the Project

Figure 14.9.28 - 2032 Departure Overflights from the Main and Northern Runways

Figure 14.9.29 - All Airport Overflights with Project Flights (20%)

Figure 14.9.30 - 2032 Air Noise Project Leq 16 hr and Noise Sensitive Community Buildings

Figure 14.9.31 - 2032 Traffic Noise Levels wit Project

Figure 14.9.32 - 2032 Traffic Noise Levels with Project with Mitigation

Figure 14.9.33 - 2032 Traffic Noise Levels with Project with Mitigation v 2032 Base

Figure 14.9.34 - 2038 Air Noise with Project Leq 16 hr

Figure 14.9.35 - 2038 Air Noise with Project Leq 8 hr Night

Figure 14.9.36 - 2038 Air Noise with Project N65 Day

Figure 14.9.37 - 2038 Air Noise with Project N60 Night

Figure 14.9.38 - 2038 Air Noise Lden Annual Contours with the Project

Figure 14.9.39 - 2038 Air Noise LNight Annual Contours with the Project

Figure 14.9.40 - 2047 Road Traffic Noise Business as Usual

Figure 14.9.41 - 2047 Road Traffic Noise Level with Project with Mitigation

Figure 14.9.42 - 2047 Road Traffic Noise Level with Project with Mitigation v 2032 Base

PEIR 2021 Volume 3: Appendices

Other Technical Documents

Economic Impact Assessment - provides the initial findings of an Economic Impact Assessment of our Project. Read our Economic Impact Assessment - view as PDF

Noise Insulation Scheme - provides details on the different levels of noise insulation available. Read our Noise Insulation Scheme - view as PDF

Outline Employment, Skills and Business Strategy - sets out how our Project will bring significant opportunities for new jobs, skills and business growth. Read our Outline Employment, Skills and Business Strategy - view as PDF

Land Use and Construction Phasing plans - various Masterplans of our Project. Read our Land Use and Construction Phasing plans - view as PDF

Reports and documents associated with our Northern Runway plans